Handloom and Textile

 

(i)                Project Package Scheme: Total fund involved under project package scheme during 2001-02 was Rs. 36.20 lakhs, out of which the entire amount of Rs. 36.20 lakhs was spent and 100 percent physical achievement was made.

 

Under Project Package Scheme during 2002-03, the total fund involvement was Rs. 31.07 lakhs and the entire amount spent with physical progress of 100 %.

 

NO fund was provided under Project Package Scheme during 2003-04 and 2004-05.

 

(ii)             Construction of Rural Workshed cum Housing: Under construction of Rural Workshed cum Housing, an amount of Rs. 4.27 lakhs was spent during 2001-02 and 100 per cent physical achievement was made.

 

Under this scheme, an amount of Rs. 9.80 lakhs was provided for 2003-04 and the entire amount was spent with 100 per cent physical achievement.

 

No fund was provided under the scheme during 2002-03 and 2004-05.

 

(iii)          Supply of Fly-Shuttle Sley and Accessories with yarn:

 

Under this scheme, an amount of Rs. 0.85 lakhs was spent during 2002-03 and 100 per cent physical achievement was made.

 

During 2003-04, an amount of Rs. 4.825 lakhs was spent under the scheme with 100 per cent physical achievement.

 

No fund was provided for 2001-02 and 2004-05.

 

(iv)         DEEN DAYAL HATH KARGHA PROTSAHAN YOJANA

 

Under this scheme, an amount of Rs. 33.60 lakhs was provided during 2003-04 and the entire amount was spent with 100 per cent physical achievement.

 

During 2004-05 also an amount of Rs. 33.60 lakhs was provided under the scheme and the entire amount was utilized with 100% physical achievement.

 

(v)              Health Package Scheme: Under Health Package Scheme, an amount of Rs. 3.0275 lakhs was spent in 2002-03 and an amount of Rs. 1.114 lakhs was spent in 2004-05.

 

No fund was provided during 2001-02 and 2003-04.

 

 

 


Statement on achievement under different schemes implemented by

Assistant Director,

Handloom and Textiles Department, Kamrup

w.e.f. 2001-02 to 2004-05

 

1.   Name of Department: Handloom and Textiles, Kamrup

2.     District: Kamrup

 

Sl. No.

Year

Name of scheme/ programme

Total fund involved (Rs. In lakhs)

Total expenditure incurred

(Rs. In lakhs)

Physical progress (In %)

Benefi-ciaries covered (Nos.)

Area covered  (Operational)

Reason for shortfall if any

Remarks

1

2

3

4

5

6

7

8

9

10

 

2001-02

1.  Project Package Scheme

36.20

36.20

100

500

i) Bezartari

Nil

i) Implemented by Kasturba Gramin Bayan S.S.Ltd

ii) Lampara

 

ii) Lampara Janajati B.K.S.S Ltd.

iii) Jiakur

 

iii) Jiakur Resham S.S. Ltd.

iv) Boromboi

 

iv) Paschim Guwahati Utpadan S.S. Ltd.

v) Soalkuchi

 

v) The Assam Co-op. Silk House Ltd.

2. Construction of Rural Workshed cum Housing

4.27

4.27

100

61

i) Baihata Chariali

 

i) Under Trimurthy B.K.S.S. Ltd.

ii) Salpara

 

ii) Salpara M.B.K.S.S. Ltd.

iii) Batarhat

 

iii) Monorama BKSS Ltd

iv) Rajapara

 

iv) Saikata Anchalik Janajati BSS Ltd.

v) North Guwahati

 

v) Uttar Guwahati Aswaklanta BSS Ltd.

vi) Gumoria

 

vi) Gumoria BSS Ltd., Hokora

vii) Jiakur

 

vii) Jiakur BKSS Ltd.

viii) Bongra

 

viii) Last Gate Anchalik Unnayan BKSS Ltd

ix) Parley

 

ix) Sri Sri Niranjan BKSS Ltd.

x) Soalkuchi

 

x) Tilakchan Pahar Udiyaman BSS Ltd.

 

2002-03

1. Project Package Scheme

31.07

31.07

100

500

i) Borka

 

i) Implemented by Borka Mohila BKSS Ltd.

ii) Soalkuchi

 

ii) Assam Samabai Resham Pratisthan Ltd.

iii) Rajabazar

 

iii) Rajabazar BKSS Ltd.

iv) Kharbhanga

 

iv) Kharbhanga  Mohila BKSS Ltd.

v) Mirza

 

v) Mirza Bishnupur MBKSS Ltd.

 

2002-03

2. Supply of Fly-Shuttle Sley and accessories with yarn (D.C.P.)

0.85

0.85

100

34

All Block area

--

--

3. Health Package Scheme

3.0275

3.0275

100

525

Do

--

--

 

2003-04

1. Deen Dayal Hathkargha Protsahan Yojana

33.60

33.60

100

300

i) Soal kuchi

 

i) The Assam Co-op. Silk Huse Ltd.

ii) Bayan Sahayaika SS Ltrd.

iii) Soalkuchi Resham SS Ltd.

iv) Pragjyoti Industrial Weaving Co-op. Ltd.

ii) Baranbori

 

v) Pachim Guwahati Utpadan SS Ltd.

iii) Bezartari

 

vi) Kasturba Gramin Bayan SS Ltd.

2. Supply of Fly-Shuttle Sley and accessories with yarn (D.C.P.)

4.825

4.825

100

143

All Block Area

--

--

3. Construction of Rural Workshed cum Housing

9.80

9.80

100

140

All Block Area

--

--

 

2004-05

1. Deen Dayal Hathkargha Protsahan Yojana

33.60

33.60

100

300

i) Saru-Agchia

--

i) Borzhar Saru Agachia Prathamic BKSS Lts.

ii) Balaparaq

 

ii) Balapara B.K.SS Ltd.

iii) Jiakur

 

iii) Jiakur Mohila BKSS Ltd.

iv) Borka

 

iv) Borka Mohila BKSS Ltd.

v) Dhopatari

 

v) Lakhimi weaving co-op. SS Ltd.

vi) Soalkuchi

 

vi) Assam Samabari Resham Prathisthan

2. Health Package Scheme

1.114

1.114

100

211

All block area

--

--